Wiley H. Bates Middle School Roof Replacement
Roof replacement and roofing tie-in design for approximately 58,500 square feet of a middle school, coordinated with an HVAC systemic renovation.

Overview
As roofing subconsultant to James Posey Associates, the MEP prime consultant, REI prepared roof replacement and roofing tie-in construction documents for Wiley H. Bates Middle School as part of a mechanical renovation. REI's field investigation included an infrared survey and investigative test cuts to determine existing construction. REI then designed the replacement of approximately 58,500 square feet of gravel-surfaced asphalt built-up roofing with a new 4-ply asphalt fiberglass built-up roof with a reflective mineral-surfaced cap sheet (hybrid system) over tapered insulation on the existing metal and concrete decks. The drawings located new mechanical equipment and detailed tie-ins where units were replaced on roof sections that were not being reroofed, along with expansion joint replacement, perimeter and through-wall flashing replacement, scuppers, roof drains, parapets and penetrations. REI prepared the technical specifications, assisted with bidding and provided construction administration, including submittal and payment reviews, site visits and clarifications, in close coordination with the MEP prime throughout design, bidding and construction.
Scope of Work
Investigated existing roofs with an infrared survey and investigative test cuts
Designed replacement of approximately 58,500 square feet of gravel-surfaced built-up roofing with a 4-ply asphalt fiberglass built-up roof and reflective mineral-surfaced cap sheet over tapered insulation
Detailed roofing tie-ins where mechanical units were replaced on roofs not being reroofed
Detailed expansion joint replacement, perimeter and through-wall flashing replacement, scuppers, roof drains, parapets and penetrations
Prepared technical specifications and assisted with bidding
Provided construction administration, including submittal and payment reviews, site visits and clarifications
Results
Coordinated the roof design with the HVAC renovation through design, bidding and construction, giving a watertight finish at mechanical unit tie-ins on roofs that were not replaced
Project Details
Client: Anne Arundel County Public Schools
Location: Annapolis, Maryland
Market: K-12 Education
Project Category: Roofing
REI Role: Subconsultant to James Posey Associates
Design (Phase 3 drawings): August 2022
Construction: First phase summer 2023; roof replacement completed 2024
Area / Quantity: Approximately 58,500 square feet of roof replacement
System(s): 4-ply asphalt fiberglass built-up roofing with reflective mineral-surfaced cap sheet (hybrid system); Tapered insulation over existing metal and concrete roof decks; Stainless steel expansion joint covers, coping end dams and through-wall flashing
Associated Work: HVAC systemic renovation (James Posey Associates, MEP prime)
Services: Roof Condition Assessment • Infrared Roof Survey • Roof Replacement Design • Bidding Assistance • Submittal Review • Construction Administration