›
Tyler Heights Elementary School Roof Replacement and New Roof Design
Roofing design for a major school renovation and addition: 60,800 square feet of replacement roofing on existing sections and approximately 27,146 square feet of new roofing on the additions.

Overview
As roofing subconsultant to Thomas Clark & Associates, REI investigated existing conditions and designed new and replacement roofing for Tyler Heights Elementary School as part of a major building renovation. The design covered 60,800 square feet of replacement roofing on the existing roof sections and approximately 27,146 square feet of new roofing on the building additions. New sections received gravel-surfaced 4-ply asphalt built-up roofing over mechanically attached insulation on sloped steel decks; existing sections received gravel-surfaced 4-ply built-up roofing over tapered insulation mopped to a base sheet mechanically attached to the existing cementitious wood fiber decks; and sloped areas received new asphalt shingles over existing and new structural steel decks. REI's drawings showed tapered insulation layouts, rooftop equipment, drains and divider curbs, with details for expansion joints, perimeter and through-wall flashing, divider curbs and primary and secondary drainage. REI prepared the technical specifications and provided contract administration during construction.
Scope of Work
Investigated existing roof conditions
Designed 60,800 square feet of replacement roofing and approximately 27,146 square feet of new roofing on additions
Specified gravel-surfaced 4-ply asphalt built-up roofing on new steel decks and on existing cementitious wood fiber decks, and asphalt shingles on sloped steel decks
Prepared roof plans with tapered insulation layouts, new rooftop equipment, drains and divider curbs
Detailed expansion joints, perimeter and through-wall flashing, divider curbs and primary and secondary drainage
Provided contract administration services during construction
Results
Detailed key transitions for long-term performance, including a coping-to-wall transition with through-wall flashing over a soldered end dam
Project Details
Client: Anne Arundel County Public Schools
Location: Annapolis, Maryland
Market: K-12 Education
Project Category: Roofing
REI Role: Subconsultant to Thomas Clark & Associates
Year: 2021
Area / Quantity: 60,800 sq ft of replacement roofing; approximately 27,146 sq ft of new roofing on additions
System(s): Gravel-surfaced 4-ply asphalt built-up roofing over mechanically attached insulation (new sloped steel decks); Gravel-surfaced 4-ply asphalt built-up roofing over tapered insulation on a mechanically attached base sheet (existing cementitious wood fiber decks); Asphalt shingles over existing and new sloped steel decks
Services: Roof Condition Assessment • Roof Replacement Design • Construction Administration




