Seneca Crossing Timber Retaining Wall Investigation and Repairs
Condition investigation with resistance drilling, repair design and construction administration for a timber retaining wall up to nearly nine feet high behind ten townhomes in Germantown, Maryland.

Overview
REI was retained by the Seneca Crossing Section II Homeowners Association to re-evaluate the timber retaining wall along the rear property lines of ten townhomes on Summer Sweet Terrace, which REI had first investigated in 2012. The battered wall retains the backyards above a wooded area, rises to nearly nine feet, and is tied back into the soil with timber deadmen at about eight feet on center. REI's January 2020 investigation combined visual observation, manual probing and resistance drilling, and found the timbers largely sound inside but decayed at butted joints and deadman ends where groundwater drains through the wall. REI then designed targeted unit-price repairs, including epoxy wood patching, top-course timber replacement and earth anchors at failed deadmen, and administered the work through 2021.
Scope of Work
Investigated the wall by visual observation and manual probing, counting decayed butted joints and deadman joints in each of the wall sections
Performed resistance drilling at 43 locations, including the end grain of deadmen, to look for hidden internal decay
Reported findings, estimated the wall's remaining service life, and recommended deadman repairs, wood consolidant treatment, vegetation removal and guard-compliant fencing
Prepared repair drawings, elevations with estimated repair quantities per wall section, and specifications for joint/crack repairs, epoxy patch repairs, top-member replacement and deadman repairs
Detailed deadman repairs using aluminum bullet earth anchors and stainless steel cable driven through sound adjacent timbers, recessed into the wall face
Ran bidding, including a pre-bid meeting, two addenda and a two-phase bid alternate, and prepared the bid evaluation
Reviewed submittals, observed construction, directed repair locations on site, reviewed payment applications, and led the punch list and final walkthrough
Results
Resistance drilling showed few hidden decay conditions, so the Association could repair the wall at its joints rather than replace it
Unit-price repair items, located on site by the contractor and REI, matched the work to actual field conditions
Deteriorated top-course timbers were replaced and failed deadmen were anchored with earth anchors
Punch list repairs at the frequently saturated base of the wall were deferred to dry weather so the epoxy patches could cure properly, and were completed in October 2021
The project was completed with no change orders
Project Details
Client: Seneca Crossing Section II Homeowners Association, Inc.
Location: Germantown, Maryland
Market: Multifamily / Condominium
Project Category: Structural Repair
REI Role: Prime Consultant
Investigation: January 2020 (report March 2020)
Bid Documents: August 2020
Substantial Completion: March 2021
Punch List Completed: October 2021
Area / Quantity: Timber retaining wall behind 10 townhomes, up to nearly 9 feet high; about 66 linear feet of timbers replaced in the top three courses at one section, plus 46.5 linear feet of timber replaced during the punch list
System(s): CCA-treated timber crib wall with timber deadman tie-backs; Abatron LiquidWood consolidant and WoodEpox patches; American Earth Anchors bullet anchors with Quickvise terminations; replacement treated timbers
Site Conditions: Occupied townhome community; wall at rear property lines above a wooded area, with groundwater draining through the wall
Services: Structural Condition Assessment • Resistance Drill Testing • Structural Repair Design • Bidding Assistance • Submittal Review • Construction Administration