Roland Park Elementary/Middle School Tile Roof Investigation and Replacement Inspection

Investigation of tile and snowguard failures on a newly replaced Spanish-style tile roof after a January 2016 snowstorm, followed by full-time third-party inspection while the tile roofing was removed and reinstalled.

Roland Park Elementary/Middle School Tile Roof Investigation and Replacement Inspection

Overview

After a significant snowstorm in January 2016, tile and snowguards failed on the newly replaced Spanish-style sloped tile roof at Roland Park Elementary/Middle School in Baltimore. Baltimore City Public Schools retained REI to investigate. REI determined that the tile and snowguards had not been installed in accordance with the manufacturer's published installation data for minimum tile lap, and issued a detailed technical report covering the failure observations and the roof's compliance with applicable codes and manufacturer requirements. REI then provided full-time third-party inspection during removal and reinstallation of the tile roofing, with same-day daily reports.


Scope of Work

  • Investigated the failed roof tile and snowguards at the newly replaced Spanish-style tile roof

  • Prepared a detailed technical report of failure observations, with commentary on compliance with applicable codes and the manufacturer's installation requirements

  • Provided full-time third-party inspection during removal and reinstallation of the tile roofing system

  • Issued daily observation reports on system design, contractor installation methods, and compliance with codes and manufacturer requirements


Results

  • Identified the cause of failure: tile and snowguard installation did not meet the manufacturer's published minimum tile lap

  • Daily reports were drafted in the field on tablets and submitted the same day, giving the Owner and Contractor timely information throughout the work


Project Details

Client: Baltimore City Public Schools

Location: Baltimore, Maryland

Market: K-12 Education

Project Category: Roofing

REI Role: Prime Consultant

Failure: January 2016 snowstorm

Year: 2017

Building: Roland Park Elementary/Middle School, 5207 Roland Avenue

System(s): Spanish-style clay tile sloped roofing with snowguards

Services: Roof Condition Assessment • Code Analysis • Construction Administration

bottom of page