River Park Townhomes Balcony Replacement Program, Phases I-IV

Multi-phase structural replacement of deteriorated balconies and stairs at the River Park townhomes in Southwest Washington, DC, using new aluminum framing with concrete-filled composite decks, traffic coatings and aluminum railings. Twenty balconies were replaced in four phases from 2019 to 2025.

River Park Townhomes Balcony Replacement Program, Phases I-IV

Overview

River Park Mutual Homes, Inc. owns the River Park community at 1301 Delaware Avenue SW, with townhomes in 15 buildings alongside a high-rise. REI has replaced the townhome balconies in phases, starting with four balconies in Phase I (2019-2020) and continuing with five each in Phases II and III (2024) and six in Phase IV (2025). REI's design removes the existing balconies and their framing and installs structural aluminum framing that carries galvanized steel composite decking, a cast-in-place reinforced concrete deck and custom aluminum railings, with a pedestrian traffic coating on the walking surfaces. Rear balconies include aluminum stairs down to the patio, and cantilevered balconies are tied back into the brick walls. Phase IV covered five first-floor rear balconies with stairs and one second-floor cantilever balcony, about 510 square feet in all. REI prepared the drawings and specifications, answered District permit review comments, evaluated pricing, and observed construction through closeout.


Scope of Work

  • Designed replacement balconies with structural aluminum beams and channels, galvanized steel form deck, and concrete decks reinforced with epoxy-coated welded wire fabric

  • Detailed aluminum stairs with tube stringers and concrete-filled channel treads, and aluminum railings with powder-coated finishes

  • Detailed polyurethane pedestrian traffic coatings, compressible expansion joints and sealants at the slab perimeter, deck weep holes, and separation between aluminum and dissimilar metals

  • Specified masonry restoration at the beam bearings, including removal and reinstallation of brick and repointing

  • Prepared Phase IV drawings and specifications, revised the drawings in response to DC Department of Buildings permit review comments, and issued the bid documents

  • Evaluated the contractor's Phase IV pricing against the most recent competitive bid and prepared the change order adding Phase IV to the construction contract

  • Observed construction, led punch-list walks, and reviewed payment applications through closeout


Results

  • Twenty townhome balconies replaced in four phases between 2019 and 2025 using one consistent aluminum-framed design

  • Phase IV permit comments resolved with revised drawings confirming that balcony footprints would not change

  • Phase IV punch-list items, including weld finishing, coating touch-up, plumb railings and masonry repairs, were corrected before closeout


Project Details

Client: River Park Mutual Homes, Inc.

Location: Washington, DC

Market: Multifamily / Condominium

Project Category: Structural Repair

REI Role: Prime Consultant

Phase I Construction: 2019-2020

Phases II and III Construction: 2024

Phase IV Design: February 2025

Phase IV Construction Completed: September 2025

Area / Quantity: 20 balconies in Phases I-IV; Phase IV: 6 balconies, about 510 sq ft (five 90 sq ft rear balconies with stairs and one 60 sq ft cantilever balcony)

System(s): Structural aluminum framing; 16 ga. galvanized steel form deck with reinforced concrete deck; polyurethane pedestrian traffic coating; aluminum stairs and powder-coated aluminum railings; masonry repairs at bearings

Contractor: C. A. Lindman (Phase I); Culbertson Company of VA, LLC (Phases II-IV)

Site Conditions: Occupied townhomes; work limited to weekday hours, with access to rear patios and adjacent units coordinated with the Owner

Services: Structural Repair Design • Permitting Assistance • Bidding Assistance • Construction Administration