Primrose Place Apartments Roofing and Facade Restoration
Investigation, report and restoration design for the brick masonry facade, windows and roofing of a nine-story, occupied high-rise apartment building, including replacement of 195 windows and 20 balcony doors, followed by construction administration through final acceptance.

Overview
The Housing Authority of Baltimore City retained REI, under a task order for the exterior analysis of HABC high-rise buildings, to investigate Primrose Place, a nine-story apartment building completed in 1982 with a brick veneer over metal stud walls on a concrete frame. The investigation combined resident surveys, visual survey from the roof and swing staging, test cuts, infrared moisture surveys, hammer sounding and water testing. REI's report found failed sealant at the control joints, deteriorated windows and sliding doors, and roofs needing catch-up maintenance. REI then prepared drawings, specifications and a unit price schedule for masonry, concrete, flashing, window and door replacement and roofing repairs, assisted HABC with bidding, and provided construction administration while residents remained in the building, including field air and water testing of the new windows and doors and review of the closeout warranties.
Scope of Work
Distributed resident surveys and compiled the results to locate reported leaks and window problems
Surveyed the facade from swing staging and the roofs, with test cuts, infrared moisture surveys, hammer sounding of concrete and water testing to find leak sources
Designed resealing of horizontal control joints at the steel shelf angles and of vertical control joints, new vertical joints at building corners, brick replacement, repointing, flashing repairs and concrete repairs and coatings
Designed replacement of 195 windows, 20 balcony doors and one steel entrance door, with sheet metal pan flashings, new metal infill panels at the corridor window tiers and EIFS at the balcony door openings
Specified roofing maintenance and repairs, including coping and counterflashing repairs, gutters, flue flashings and overflow scuppers
Prepared specifications and a unit price schedule, reviewed bids, submittals and change orders, and observed construction with field air and water testing of the new windows
Results
REI confirmed final completion of the work in August 2012, after REI's own inspections and separate inspections by HABC's inspector and the building's maintenance supervisor
Field air and water tests of the new windows were witnessed by REI, and windows that failed were adjusted and retested
REI reviewed the closeout warranties, including 10-year manufacturer's warranties on the EIFS and sealants and a 20-year warranty on the metal panels
Project Details
Client: Housing Authority of Baltimore City (HABC)
Location: 820 S. Caton Avenue, Baltimore, Maryland
Market: Multifamily / Condominium
Project Category: Facade
REI Role: Prime Consultant
Investigation and Report: December 2008 - January 2009
Design Completed: 2009
Construction: June 2010 - 2012
Final Acceptance: August 2012
Building: Nine-story occupied apartment building (completed 1982); brick veneer over metal stud walls on a poured concrete frame
Quantities: 195 windows, 20 balcony doors and 1 steel entrance door replaced; Horizontal and vertical control joints resealed; brick masonry repointing and brick replacement
Contractors: Centennial Contractors Enterprises, Inc. (prime contractor); Eastern Waterproofing & Restoration (masonry); windows by Architectural Window Manufacturing Corp.
HABC Contract: HAE-2466
Services: Facade Condition Assessment • Window Condition Assessment • Roof Condition Assessment • Infrared Roof Survey • Water Testing • Facade Restoration Design • Masonry Restoration Design • Roof Maintenance and Repair • Bidding Assistance • Submittal Review • Construction Administration