Structural investigation and replacement design for a deteriorated elevated entrance terrace at Pilgrim Rest Baptist Church, including new structural steel framing, composite deck, drainage, waterproofing, flashings and traffic coating, with bidding and construction administration through completion in 2019.

Pilgrim Rest Baptist Church Entrance Terrace Replacement

Overview

Pilgrim Rest Baptist Church retained REI to investigate deterioration of the structural steel framing supporting the elevated, second-story entrance terrace above the church's front doors. In November 2018 REI inspected the terrace from above and below, measured remaining steel thickness with an ultrasonic gauge, and found that the terrace had no drain or waterproofing and sloped toward open perimeter joints, which had allowed water to severely corrode the form deck and the steel framing at the outer half of the terrace. REI recommended interim shoring and limited foot traffic, and prepared a detailed technical report. REI then designed reconstruction of the approximately 230-square-foot terrace, from new steel framing and composite deck through waterproofing, flashing, topping slab and traffic coating, along with a new drain, a rebuilt brick parapet, a new soffit below, stair repairs and recoating, and masonry repairs. REI assisted with bidding and provided contract administration and special inspections for structural steel and concrete during construction, which reached substantial completion in September 2019.


Scope of Work

  • Evaluated the existing waterproofing and structural conditions of the elevated terrace, including ultrasonic thickness testing of the steel framing, and prepared a detailed technical report

  • Designed replacement of the structural steel I-beam and channel framing and the composite (steel and concrete) deck

  • Designed rubberized asphalt waterproofing, stainless steel through-wall flashing, a concrete topping slab, and pedestrian traffic coating with tie-in at the access stairs

  • Designed a new terrace drain and drain line, a rebuilt brick parapet at the terrace edge, an exterior gypsum soffit below the terrace, concrete repairs and traffic coating at the access stairs, and brick masonry repairs

  • Assisted with bidding and provided contract administration, including special inspections for structural steel and concrete


Results

  • Substantially complete in September 2019, about three months after contract execution

  • No additive change orders; the only change order was a credit for unused unit-price allowance quantities


Project Details

Client: Pilgrim Rest Baptist Church

Location: Washington, D.C.

Market: Religious

Project Category: Structural Repair

REI Role: Prime Consultant

Investigation: November - December 2018

Design / Bidding: January - June 2019

Substantial Completion: September 2019

Area / Quantity: Approximately 230 SF elevated (second-story) entrance terrace, plus access stairs and landings

Contractor: C.A. Lindman, Inc.

System(s): Structural steel I-beam and channel framing; composite steel and concrete deck; rubberized asphalt waterproofing; stainless steel through-wall flashing; concrete topping slab; pedestrian traffic coating

Services: Structural Condition Assessment • Structural Repair Design • Waterproofing Design • Bidding Assistance • Construction Administration