Parkside High School Roof Replacement

Roof replacement design and construction administration for approximately 247,000 SF of built-up, asphalt shingle and slate roofing at Parkside High School.

Parkside High School Roof Replacement

Overview

REI was retained by Wicomico County Public Schools to provide roof replacement consulting services for Parkside High School. The project covered approximately 247,000 SF of roofing: 143,000 SF of built-up roofing, 78,000 SF of asphalt shingle roofing and 26,000 SF of slate shingle roofing.


Scope of Work

  • Conducted roof condition assessment, including infrared survey and investigative test cuts

  • Prepared construction documents with a base bid for 80-mil TPO and add-alternates for PVC, asphalt shingle and standing seam metal roofing

  • Designed replacement of two skylights

  • Designed structural modifications to raise and reinforce steel dunnage at 18 rooftop unit locations

  • Provided bidding assistance and construction administration over two phases


Results

  • Structured the bid with a base bid and add-alternates; the owner selected 80-mil TPO, with slate sections replaced by prefinished aluminum standing seam metal roofing

  • Adapted to the owner's switch to construction-manager delivery before bidding, with contingencies added for possible cost increases

  • Unused unit-price allowances and contingency were credited back at closeout, nearly 10% of the construction contract


Project Details

Client: Wicomico County Public Schools

Location: Salisbury, Maryland

Market: K-12 Education

Project Category: Roofing

REI Role: Prime Consultant

Design Completed: November 2023

Construction Completed: October 2025

Area / Quantity: 247,000 SF of roofing

System(s): 80-mil TPO; prefinished aluminum standing seam metal roofing

Phases: 2 phases of construction

Services: Roof Condition Assessment • Infrared Roof Survey • Roof Replacement Design • Structural Dunnage Design • Bidding Assistance • Construction Administration