Tysons Park Place II Roof Terrace Paver Ballast Design
Wind uplift and overturning analysis to set paver weights and hold-down requirements for a new rooftop terrace on a high-rise office building in Tysons, Virginia.

Overview
Tysons Park Place II is a high-rise office building on Jones Branch Drive in McLean, Virginia, where a new rooftop terrace with pedestal-mounted pavers and planters was planned on the existing ballasted roof. REI was retained by the project architect to determine how heavy the pavers needed to be, or how they must be held down, to resist wind uplift. REI surveyed the roof, calculated wind pressures under ASCE 7-16, and applied the paver uplift method of SPRI RP-4. REI established the width of the roof perimeter zone and confirmed that the planned terrace lay entirely within the field of the roof. REI then analyzed overturning of pavers raised up to about 10 inches on pedestals. The minimum weight was 26.2 psf for unstrapped pavers and 10.5 psf for strapped pavers. REI recommended 3-inch unstrapped precast pavers, which the structural engineer confirmed the reinforced roof could carry. REI also confirmed that the soil-filled planters needed no added hold-downs, and that the pedestals must be noncombustible to meet the local fire code.
Scope of Work
Surveyed the existing roof, parapets and the area of the planned terrace
Calculated wind pressures under ASCE 7-16 and paver uplift under SPRI RP-4
Determined the perimeter zone width and set the minimum setback of the terrace from the roof edge
Analyzed paver overturning on pedestals up to about 10 inches high and set minimum paver weights for unstrapped and strapped installations
Evaluated a kerf-cut hold-down alternative and the stability of soil-filled planters
Recommended the paver system and noncombustible pedestals and issued a sealed letter with calculations
Project Details
Client: Tysons Park Place II
Location: McLean, Virginia
Market: Commercial
Project Category: Roofing
REI Role: Wind Uplift and Ballast Design Engineer
Analysis and ballast design: 2023
Building: High-rise office building
System(s): Precast concrete pavers on pedestals and planters over a ballasted roof
Services: Roof Survey • Wind Uplift Analysis • Paver Ballast Design