National Archives II Parking Garage Structural and Waterproofing Repairs

Investigation and design of structural upgrades and waterproofing repairs at the three-story precast concrete parking garage serving the National Archives II facility, followed by a fire damage assessment after a car fire inside the garage.

National Archives II Parking Garage Structural and Waterproofing Repairs

Overview

As a subconsultant to Grunley Construction Company, REI investigated and designed structural and waterproofing repairs for the precast double-tee parking garage at the National Archives II facility, 8601 Adelphi Road. The design addressed failed connections between double-tee flanges, movement at the garage expansion joints, deteriorated bearing pads and joints, and the traffic coating on the parking deck. Repairs were built by C.A. Lindman from March through November 2014. When a car fire broke out on Level G2 in September 2014, REI assessed the damage the same day and recommended repairs based on field evidence and core testing.


Scope of Work

  • Investigated the garage structure and waterproofing, and prepared repair drawings and specifications

  • Designed carbon fiber (CFRP) shear connections between adjacent concrete double-tee flanges

  • Designed steel shear transfer devices with slide bearings at the expansion joints, allowing horizontal movement while restraining vertical movement

  • Designed replacement of expansion joints, control joints and neoprene bearing pads below the double-tee stems, and concrete patch and crack repairs

  • Specified re-coating of the parking deck with a vehicular traffic coating system

  • Reviewed submittals and welder qualifications, and provided construction observation through 12 observation reports

  • Assessed damage from a September 2014 car fire on Level G2, including core sampling and testing, and recommended repairs


Results

  • Estimated the fire's temperatures from field evidence (spalling, soot patterns and melted cable coatings) and confirmed with core tests that the concrete beyond the surface was sound, so repairs could be limited to surface patching, bearing pads and shear connectors

  • Found incorrectly installed slide bearing assemblies during a later investigation and directed their correction across the G2 and G3 expansion joints

  • Investigated later traffic coating delamination with bond pull testing to identify the cause of failure


Project Details

Client: Grunley Construction Company, for the National Archives and Records Administration (NARA)

Location: College Park, Maryland

Market: Government

Project Category: Structural Repair

REI Role: Subconsultant to Grunley Construction Company

Design Completed: 2013

Construction Completed: November 2014 (slide bearing corrections March 2015)

Structure: Three-story precast, prestressed concrete double-tee parking garage (Levels G2 and G3 parking decks)

System(s): CFRP shear connectors; steel shear transfer devices with slide bearings; expansion and control joints; neoprene bearing pads; vehicular traffic coating

Services: Structural Condition Assessment • Structural Repair Design • Waterproofing Design • Submittal Review • Construction Administration • Fire Damage Assessment