Mockingbird Station Parking Garage Cooling Tower Support, Repairs and Condition Survey
Structural design to carry two new cooling towers on the top level of a six-story precast concrete parking garage, including steel support framing, fiber reinforced polymer (FRP) strengthening of the double tees and concrete repairs, followed by a condition survey of the entire garage.

Overview
As part of the Mockingbird Station Central Plant Upgrade, Phase 1, REI designed the structural support for new cooling towers on the top level of the open-air precast concrete parking garage at 5307 East Mockingbird Lane. The new towers were about 12,000 lb heavier than the unit the garage was designed for. REI's drawings provided a fixed steel support frame on posts anchored into the double tees, a floating grillage frame on spring vibration isolators to carry the two cooling tower cells, external FRP reinforcement of the precast double tee stems below, and concrete repairs to the topping slab and soffits. The drawings also covered steel framing for a new outside air handling unit over a ventilation shaft, ductwork supports, guardrail, fence and bollards, and a roof hatch. During construction REI observed the concrete repairs and FRP work, sounded the soffits and marked additional repairs. REI then performed a visual survey of the whole garage, with hammer sounding of concrete components, and reported on cracking, corrosion, failed connections, leaks and drainage with immediate and long-term repair recommendations.
Scope of Work
Analyzed the precast structure for new cooling towers about 12,000 lb heavier than the original 18,000 lb design load
Designed a fixed steel support frame anchored into the double tees, with a floating grillage frame on spring isolators to carry the two cooling tower cells
Specified external FRP reinforcement of the precast double tee stems, with performance criteria for the contractor's FRP design, and FRP at the L-shaped perimeter girder by change order
Specified concrete repairs to the topping slab, double tee soffits and beams, with a unit price schedule for bidding
Designed steel framing for a new outside air handling unit over a masonry ventilation shaft, ductwork supports, and new guardrail, fence, bollards and roof hatch
Construction observation of concrete repairs and FRP preparation, including sounding the soffits and marking additional repairs
Visual condition survey of the six-story garage with hammer sounding, and a report of observations, findings and immediate and long-term repair recommendations
Results
The garage was strengthened to carry the new, heavier cooling towers
The mechanical contractor laid out the towers, supports and piping from REI's drawings and complimented the design team on the accuracy of the drawings
The condition survey gave the owner a phased plan of immediate repairs at the upper levels and future repairs at the lower levels
Project Details
Client: Real Estate Capital Partners
Location: Dallas, Texas
Market: Commercial
Project Category: Structural Repair
REI Role: Prime Consultant (structural engineer to the owner)
Design Completed: 2009 (permit and pricing set issued August 2009)
Construction: February - March 2010
Garage Condition Survey: 2010
Structure: Six-story, open-air precast concrete parking garage (built about 1977) with 8 ft wide prestressed double tees, inverted-tee and L-shaped beams, and a 2 in. topping slab
Parking Area: About 105,000 sq ft on Levels 3 through 6
System(s): Steel support and grillage framing on spring isolators; FRP reinforcement of double tees and perimeter girder; concrete repairs
Contractor: United Mechanical (general contractor); Delta Structural (FRP subcontractor)
Services: Structural Dunnage Design • Structural Repair Design • Structural Condition Assessment • Bidding Assistance • Construction Administration