The Maryland Archaeological Conservation Laboratory at Jefferson Patterson Park and Museum, completed in 1996, houses the state's archaeological collections. It had roof and wall leaks, leaks through its foundation walls, and high humidity and mold in several rooms. REI's 2016–2017 investigation used test cuts and water testing to trace the problems to failed foundation waterproofing, deteriorated and poorly ventilated wood siding, and an envelope with no continuous vapor barrier. REI designed replacement of all three systems, tied together into one continuous barrier, and administered construction through substantial completion in August 2022.


Scope of Work

  • Investigated the roofing, siding and foundation waterproofing with test cuts and water tests, and reviewed the original construction documents

  • Designed new rubberized asphalt foundation waterproofing with rigid insulation, foundation drains and concrete crack repairs

  • Designed replacement of the wood siding with cement board siding over a liquid-applied vapor barrier and continuous insulation

  • Designed a new standing seam metal roofing system with a vapor barrier and added insulation, tied into the wall vapor barrier

  • Added gutters, downspouts tied into storm drainage, and snow guards at roof eaves that previously had none

  • Prepared wind load, gutter and downspout calculations, and revised the bid documents for rebidding in 2019

  • Provided construction administration, including observation reports, RFIs, change orders and the substantial completion inspection


Results

  • Tied the foundation waterproofing, wall vapor barrier and roof vapor barrier into one continuous system to stop leaks and help control humidity in collection spaces

  • Replaced wood siding that had been repainted repeatedly with longer-lasting cement board siding, in a smooth finish to match surrounding buildings

  • Where existing foundation waterproofing was still sound, revised the scope during construction to reuse it, reducing excavation


Project Details

Client: Maryland Department of General Services, for Jefferson Patterson Park and Museum

Location: St. Leonard, Maryland

Market: Government

Project Category: Roofing / Facade / Waterproofing

REI Role: Prime Consultant to Maryland DGS

Design: Investigation report: January 2017; Construction documents: December 2017; revised for rebid June 2019

Construction Completed: August 2022

Area / Quantity: Approximately 44,000 SF of roofing and 16,000 SF of siding (2017 report estimates)

System(s): Standing seam metal roofing with vapor barrier and insulation; cement board siding over liquid-applied vapor barrier and continuous insulation; rubberized asphalt foundation waterproofing; hanging gutters and snow guards

Building: Laboratory completed 1996; CMU walls, steel and wood plank roof decks

Services: Facade Condition Assessment • Roof Condition Assessment • Water Testing • Facade Restoration Design • Roof Replacement Design • Waterproofing Design • Construction Administration