Manassas Public Safety Facility Building Envelope Peer Review
Building envelope peer review of the architect's construction documents for the City of Manassas's new Public Safety Facility, covering roofing, plaza and terrace waterproofing, air/vapor barrier, masonry flashing, copings and below-grade waterproofing, followed by envelope observation during construction.

Overview
The City of Manassas engaged REI to review the building envelope design for its new Public Safety Facility on Grant Avenue, a multi-story building with a main building, auxiliary building and connecting bridge, designed by Hellmuth, Obata & Kassabaum (HOK). REI reviewed the 50 percent construction documents in November - December 2019 and the 95 percent drawings and specifications in March 2020, issuing more than 100 itemized comments at each stage on the structural, architectural, plumbing, mechanical and electrical sheets and the envelope specification sections, and back-checked HOK's check set in April 2020. REI also drew proposed alternate details for typical conditions, including parapets at the main roof, curtain wall and metal wall panels, window sills and heads, and through-wall flashing, to illustrate its recommendations. During construction (2021 - 2022), REI observed the air barrier, masonry through-wall flashing, hot-applied rubberized asphalt and PVC roofing, terrace pavers and metal wall panels, attended mock-up and roofing preconstruction meetings, and prepared a roofing punch list in December 2022.
Scope of Work
Reviewed the 50 percent construction documents (November - December 2019) and the 95 percent drawings and specifications (March 2020), with comments logged by sheet and detail
Checked roof and terrace drainage: deck slope versus tapered insulation, overflow scuppers and drains, cricket proportions, drain locations and flashing heights at door sills, hatches and curbs
Reviewed continuity of the air/vapor barrier at slab edges, columns, expansion joints, windows and roof tie-ins, and the detailing of stainless steel through-wall, sill and head flashings
Reviewed parapet blocking, copings, counterflashings, expansion joint covers, below-grade waterproofing terminations and the roofing, waterproofing, sheet metal and sealant specification sections
Prepared proposed alternate details for typical parapet, curtain wall, sill and through-wall flashing conditions, and back-checked the April 2020 check set against REI's comments
Observed building envelope construction from July 2021 through a final roofing punch list in December 2022
Results
REI's back-check of the April 2020 check set found many comments addressed, including added overflow scuppers and drainage provisions, completed roof edge and detail references, and new details for flashing and air/vapor barrier transitions
Recommended simpler, shop-fabricated copings and continuous plywood substrates in place of pre-fabricated extruded copings, for easier detailing at seams and transitions and lower cost
Gave the City an independent envelope reviewer through construction, with field reports issued immediately to the contractor team and a documented roofing punch list at completion
Project Details
Client: City of Manassas, Virginia
Location: Manassas, Virginia
Market: Government
Project Category: Peer Review
REI Role: Building Envelope Peer Reviewer to the City of Manassas
Design Peer Review: November 2019 - April 2020 (50% CD, 95% CD and check set back-check)
Construction Observation: July 2021 - December 2022
Systems Reviewed: Hot-applied rubberized asphalt protected membrane roofing and terraces with concrete pavers; PVC single-ply roofing; Sheet membrane air/vapor barrier; Brick and CMU veneer with stainless steel through-wall flashing; Curtain wall, windows and metal wall panels; Below-grade waterproofing
Architect: Hellmuth, Obata & Kassabaum (HOK)
General Contractor: Kenbridge Construction Company
Services: Design Peer Review • Specification Review • Constructability Review • Construction Administration