Manassas Park High School Roof Replacement

Roof investigation and report, followed by design and construction administration to replace about 72,000 square feet of ballasted EPDM roofing with a 60-mil PVC system, reusing the existing insulation where possible.

Manassas Park High School Roof Replacement

Overview

Manassas Park City Schools retained REI for a comprehensive investigation of the roofing at Manassas Park High School, including investigative test cuts and field measurements. REI's report recommended replacement and compared two systems, built-up and PVC, with estimated construction costs. REI then designed the replacement of approximately 72,000 square feet of ballasted EPDM roofing with a new 60-mil PVC roof over flat and tapered polyisocyanurate insulation on the existing steel decks. The drawings detailed reuse of the existing insulation to reduce waste and cost, and the design replicated the original architectural coping. Supply chain issues split the work, first planned for summer 2021, into two phases, with completion in 2022. The project was substantially completed on time.


Scope of Work

  • Investigated the existing roofing with test cuts and field measurements, and prepared a report of observations, findings and recommendations

  • Compared two replacement systems (built-up and PVC) with estimated construction costs

  • Designed replacement of approximately 72,000 square feet of ballasted EPDM roofing with 60-mil PVC over flat and tapered polyisocyanurate insulation on existing steel decks

  • Detailed reuse of the existing insulation and replication of the original architectural coping

  • Prepared technical specifications for the full scope of work

  • Provided construction administration, including submittal review, payment application review, site visits and contract clarification


Results

  • Reused existing insulation to reduce waste and cost

  • Kept the work moving through supply chain disruptions by splitting construction into two phases

  • Substantially completed on time


Project Details

Client: Manassas Park City Schools

Location: Manassas Park, Virginia

Market: K-12 Education

Project Category: Roofing

REI Role: Prime Consultant

Construction: Two phases, 2021–2022

Construction Completed: 2022

Area / Quantity: Approximately 72,000 SF

System(s): 60-mil PVC single-ply roofing over flat and tapered polyisocyanurate insulation on existing steel roof decks; replicated architectural coping

Location: 8200 Euclid Avenue, Manassas Park, Virginia

Services: Roof Condition Assessment • Roof Replacement Design • Submittal Review • Construction Administration