Investigation, report and design for replacement of 103,150 square feet of single-ply roofing with a fully adhered 60-mil PVC roof, with new drainage, skylights and flashings, built in two phases during 2020-2021.

John Adams Elementary School Roof Replacement

Overview

Alexandria City Public Schools retained REI to evaluate and replace the roofs of John Adams Elementary School. In November 2019 and January 2020 REI surveyed the roofs of the 1966 school, observed test cuts made at its direction, and found the original Hypalon (CSPE) single-ply membranes loose, chalky and ponding, with wet insulation over the original coal tar built-up roofing. REI's report recommended replacing the original roofs while keeping the newer addition roofs, which were in good condition. REI then designed replacement of 103,150 square feet of single-ply membrane with a new fully adhered 60-mil PVC membrane over tapered and flat insulation on the existing low-sloped gypsum and steel roof decks. The design also modified the primary drainage, added overflow scuppers and drains, replaced the skylights and perimeter and through-wall flashings, and repaired the brick facade, with isometric details for difficult transitions such as the coping termination at masonry walls. REI assisted with bidding and administered construction in two phases from June 2020 into early 2021. When demolition revealed gypsum roof deck deterioration far beyond what could be anticipated, REI directed full-depth deck patching with new supports, formboard and reinforcing, and when deteriorated Orangeburg (bituminized fiber) storm drain piping kept roof drains from working, REI coordinated camera inspection and repair or rerouting of the affected drain lines.


Scope of Work

  • Investigated the roofs and observed investigative test cuts, and prepared a Preliminary Project Evaluation Report with findings, recommendations and a cost estimate

  • Designed a fully adhered 60-mil fiberglass-reinforced PVC membrane over new tapered and flat insulation (average R-30 per the 2015 IECC) on the existing gypsum, steel and concrete roof decks

  • Designed modifications to the primary drainage and new overflow scuppers and drains

  • Designed new aluminum copings, gravel stops and counterflashings, stainless steel through-wall flashings, replacement skylights, roof hatches and access ladders, and brick repointing and repairs above the roof line

  • Detailed difficult transitions for long-term performance, including the coping termination at masonry walls

  • Assisted with bidding and administered construction through two phases, including observation reports, change order reviews and punch list inspections


Results

  • Replaced 103,150 square feet of roofing over two phases of construction

  • Repaired extensively deteriorated gypsum roof deck uncovered during demolition, including more than 2,200 square feet of full-depth patching in Phase II alone

  • Restored roof drainage by repairing or rerouting deteriorated storm drain lines found during construction


Project Details

Client: Alexandria City Public Schools

Location: Alexandria, Virginia

Market: K-12 Education

Project Category: Roofing

REI Role: Prime Consultant

Investigation & Report: November 2019 - January 2020

Design & Bidding: February - April 2020

Construction: June 2020 - March 2021

Area / Quantity: 103,150 square feet (original 1966 roofs; newer addition roofs retained)

Contractor: Alonzo Ours Construction, Inc.

System(s): Fully adhered 60-mil fiberglass-reinforced PVC membrane over tapered and flat polyiso insulation, replacing Hypalon (CSPE) single-ply; existing gypsum, steel and concrete roof decks; aluminum coping, gravel stops and counterflashing; stainless steel through-wall flashing; replacement skylights; overflow scuppers and drains

Services: Roof Condition Assessment • Roof Replacement Design • Bidding Assistance • Construction Administration