J. Van Story Branch Sr. Apartments Waterproofing and Facade Restoration

Phased investigation, design and construction administration, from 2008 through 2015, for facade and roofing restoration of an 18-story brick masonry high-rise apartment building, including a new drainable EIFS and replacement of more than 700 windows and sliding glass doors.

J. Van Story Branch Sr. Apartments Waterproofing and Facade Restoration

Overview

The Housing Authority of Baltimore City retained REI to investigate leaks and restore the facade and roofing of the J. Van Story Branch Sr. Apartments, an 18-story brick masonry high-rise in Baltimore. The work was a long-term, phased effort that began with an investigation and report and carried through design, window and door replacement and a new drainable EIFS over the original brick, spanning roughly 2008 to 2015.

REI's investigation found that the through-wall flashing was discontinuous at the perimeter concrete columns and lacked end dams at its terminations, both contributing to leaks. Based on the success of the system at another HABC property, Wyman House, HABC elected to install a drainable EIFS over the brick. REI prepared the design, specifications and a unit price schedule, assisted with bidding and performed contract administration as the work was constructed in phases.


Investigation and Report (2008–2009)

  • Distributed resident surveys and compiled the data, and surveyed the roofing and facade from the roof and swing staging

  • Made facade test cuts to determine as-built through-wall flashing and shelf angle conditions, hammer-sounded concrete and performed water testing to identify leak sources

  • Performed infrared moisture surveys to locate wet roof insulation

  • Reported the findings with repair recommendations


Design

  • Designed brick veneer repairs to provide a waterproof secondary barrier and a new drainable EIFS with standard and brick-textured finishes

  • Designed replacement of 357 horizontal sliding windows, 34 fixed windows, 323 sliding glass doors and various storefront and curtain wall systems, with AAMA testing of the new units

  • Designed concrete repair and recoating, new balcony railings and drainage scuppers, and minor roofing repairs; prepared front-end and technical specifications and a unit price schedule


Phased Construction (2013–2015)

  • Assisted with bidding and provided contract administration during construction

  • Window and sliding glass door replacement was under way by 2013

  • The drainable EIFS with brick-pattern and painted finishes, new sill flashings and the remaining facade work were installed from swing stages in 2014 and completed in early 2015


Results

  • Identified discontinuous through-wall flashing at the perimeter concrete columns and missing end dams as contributors to leaks

  • Renewed the entire building envelope of the 18-story tower with new windows, sliding glass doors and a drainable EIFS


Project Details

Client: Housing Authority of Baltimore City (HABC)

Location: Baltimore, Maryland

Market: Multifamily / Condominium

Project Category: Facade

REI Role: Prime Consultant

Years: 2008–2015 (investigation 2008–2009; construction 2013–2015)

Building: 18-story brick masonry high-rise apartment building

Area / Quantity: 357 horizontal sliding windows, 34 fixed windows and 323 sliding glass doors replaced, plus storefront and curtain wall systems

System(s): Drainable EIFS with standard and brick-textured finishes over repaired brick veneer; new windows and sliding glass doors; new balcony railings and drainage scuppers

Services: Facade Condition Assessment • Infrared Roof Survey • Water Testing • Facade Restoration Design • Masonry Restoration Design • Bidding Assistance • Construction Administration