Hartwood High School Building Envelope Peer Review
Building envelope peer review for Stafford County's new Hartwood High School, from the roofing, wall and window details of the architect's design development drawings through submittal review, mock-up review and construction observation of the roofing, masonry, metal wall panels and windows.

Overview
Hartwood High School, designed as High School No. 6, is a new three-story high school for Stafford County Public Schools on Truslow Road in Stafford County, designed by Grimm + Parker. Its walls combine brick veneer and metal wall panels with continuous insulation, a spray-applied air barrier and aluminum storefront windows, under built-up asphalt roofing and standing seam metal roofs. REI peer reviewed the building envelope portions of the August 2022 design development drawings, marking up the roof plan, wall sections and flashing details with comments on roof drainage, tapered insulation and crickets, expansion joints, roof edge blocking, sheet metal flashings and the air barrier. REI continued with the project into construction, reviewing roofing, sheet metal, wall panel, sub-girt and storefront submittals, preparing coordination details for the window openings in the masonry and metal panel walls, reviewing the wall panel mock-up, responding to RFIs, and observing the building envelope work through the roofing and facade punch lists in June 2026.
Scope of Work
Peer reviewed the design development roof plan, wall sections and flashing details, with keyed comments and recommended drain sump and cricket configurations
Reviewed roofing and envelope submittals, including installer qualifications, built-up roofing, metal roof panels, sheet metal coping and flashing, roof expansion joints, metal wall panels, the thermal sub-girt system and aluminum storefronts
Prepared window opening coordination details showing the sequence and responsible trade for each component at masonry and metal panel openings
Reviewed the metal wall panel mock-up and responded to RFIs on flashing details
Performed construction observation of the roofing, air barrier, masonry, metal wall panels and windows, with roofing and facade punch lists
Results
Recommended standard drain sump sizes and a minimum 3:1 cricket aspect ratio to simplify tapered insulation installation and reduce material waste
Identified roof areas needing added drains, crickets or independent drainage at expansion joints, and called for clarification of rooftop blocking and roof edge details
Recommended flashing and air barrier improvements in the wall details, including taller drip flashing flanges, termination bars and end dams, and continuity of the air barrier on the sheathing
Helped confirm the built-up roofing met the specified four-ply system and wind uplift requirements, with a warranty wind rider recommended to cover the design wind speed
Project Details
Client: Stafford County Public Schools (SCPS)
Location: Fredericksburg (Stafford County), Virginia
Market: K-12 Education
Project Category: Peer Review
REI Role: Building Envelope Peer Reviewer to Grimm + Parker Architects
Design Development Review: August - September 2022
Submittal Review: December 2023 - 2025
Construction Observation: Fall 2024 - June 2026 (roofing and facade punch lists)
Systems Reviewed: Built-up asphalt roofing over tapered insulation, and standing seam metal roofing; Brick veneer and metal wall panels on a thermal sub-girt system with continuous insulation and spray-applied air barrier; Aluminum storefront windows and entrances, sheet metal coping, flashing, gutters and roof expansion joints
Architect: Grimm + Parker
Documents Reviewed: Design development drawings (August 2022); construction submittals, mock-up and RFIs (2023 - 2025)
Contractors: Howard Shockey & Sons (general contractor); MBP (construction manager)
Services: Design Peer Review • Constructability Review • Submittal Review • Construction Administration