Two-phase roof replacement design and construction administration for approximately 194,500 SF of roofing at Great Mills High School, including a barrel-vault standing seam metal roof and two skylights.

Great Mills High School Roof Replacement

Overview

REI was retained by St. Mary's County Public Schools to provide roof replacement consulting services for Great Mills High School. Design and construction were carried out in two phases. Phase I covered approximately 71,500 SF of roofing. Phase II covered approximately 123,000 SF, including approximately 2,600 SF of standing seam metal roofing.


Scope of Work

  • Conducted roof condition assessment, including observation of investigative test cuts

  • Prepared construction documents and specifications for 4-ply asphalt fiberglass built-up roofing with a reflective mineral-surfaced cap sheet (hybrid system)

  • Designed replacement of the barrel-vault standing seam roof with prefinished aluminum standing seam metal roofing, and replacement of two skylights

  • Designed structural modifications to raise existing steel dunnage at the chiller and support a future replacement chiller

  • Provided bidding assistance and construction administration for both phases


Results

  • Divided approximately 194,500 SF of roofing into two separately designed, bid and constructed phases

  • Designed the chiller dunnage to carry both the existing chiller and a replacement chiller to be installed later

  • Phase I construction closed under its original contract amount


Project Details

Client: St. Mary's County Public Schools

Location: Great Mills, Maryland

Market: K-12 Education

Project Category: Roofing

REI Role: Prime Consultant

Design: Phase I: February 2020; Phase II: November 2023

Construction: Phase I: November 2020; Phase II: June 2026

Area / Quantity: 194,500 SF of roofing (Phase I: 71,500 SF; Phase II: 123,000 SF)

System(s): 4-ply asphalt fiberglass built-up roof with reflective mineral-surfaced cap sheet (hybrid system); prefinished aluminum standing seam metal roofing

Phases: 2 phases of design and construction

Services: Roof Condition Assessment • Roof Replacement Design • Structural Dunnage Design • Bidding Assistance • Construction Administration