Grafton Village Elementary School Roof Retrofit

Roofing peer reviewer to the architect for the renovation and addition of an elementary school. REI recommended a retrofit steep-slope framing and standing seam metal roof over part of the original flat roof to house relocated mechanical equipment, commented on the 75 and 90 percent design documents, and observed the roofing work during construction.

Grafton Village Elementary School Roof Retrofit

Overview

The comprehensive renovation and addition of Grafton Village Elementary School was designed by Hord Coplan Macht. REI was not the designer of record; it assisted the architect as roofing peer reviewer, providing comments and recommendations during design. The design relocated a substantial amount of mechanical equipment onto the original flat roofs. REI recommended a retrofit steep-slope framing and standing seam metal roofing system over a portion of the original roof, which both improved the appearance of the front elevation and created new attic space to house the new mechanical equipment. REI marked up the proposed roof layout (tapered insulation, drainage and retrofit framing supports), provided sample specification sections for the retrofit framing, metal roof panels and built-up roofing, and peer reviewed HCM's 75 and 90 percent drawings and specifications. During construction REI reviewed the roofing submittals and shop drawings, including the engineered attachment of the retrofit framing, and observed the retrofit framing, metal roofing and new modified bitumen built-up roofing through a final punch list in July 2014.


Scope of Work

  • Recommended a retrofit steep-slope framing and standing seam metal roofing system over a portion of the original flat roof

  • Marked up the proposed roof layout for tapered insulation, drainage and retrofit framing supports, and provided sample specification sections for the retrofit framing, metal roof panels and built-up roofing

  • Peer reviewed HCM's 75 and 90 percent drawings and specifications for the roofing, flashing, insulation and air barrier work

  • Reviewed roofing submittals and shop drawings, including retrofit framing attachment calculations, wind load and compression test data

  • Performed construction observation of the retrofit framing, metal roofing and replacement built-up roofing, with a final roofing punch list


Results

  • Created new attic space to house mechanical equipment relocated to the roof

  • Dramatically altered and improved the appearance of the building's front elevation

  • Remaining flat roofs replaced with new modified bitumen built-up roofing over tapered insulation


Project Details

Client: Stafford County Public Schools (SCPS)

Location: Fredericksburg (Stafford County), Virginia

Market: K-12 Education

Project Category: Peer Review

REI Role: Roofing Peer Reviewer to Hord Coplan Macht (HCM)

Design: 2012 (75% and 90% reviews, November - December 2012)

Bidding: February 2013

Roofing Construction: Early 2014 - July 2014 (punch list)

System(s): Retrofit steep-slope light-gauge framing over the original flat roof; 24 gauge standing seam metal roofing with hanging gutters; Modified bitumen built-up roofing over tapered insulation on the remaining low-slope roofs

Architect: Hord Coplan Macht

Contractors: Loughridge & Co. (general contractor); P K Contractors (roofing)

Services: Design Peer Review • Specification Review • Submittal Review • Construction Administration