GMU Hylton Performing Arts Center Copper Roofing and Siding

Design-build engineering, sealed drawings and construction observation for the curved and angled standing seam copper roof and wall cladding of the theater at George Mason University's Hylton Performing Arts Center, recognized with a 2011 Excellence in Copper Architecture Award.

GMU Hylton Performing Arts Center Copper Roofing and Siding

Overview

The Hylton Performing Arts Center, a joint project of state and local authorities and George Mason University, is a new performing arts facility on the university's Prince William campus in Manassas. Its theater building is a striking form of curved and angled walls and roof, fully clad in architectural copper. The copper wall and roof work was design-build: REI worked for the sheet metal contractor, The James Myers Company, alongside the general contractor (Whiting-Turner) and the project architect (Hughes Group Architects). REI calculated wind uplift and fastener pull-out resistance, engineered the attachment of the panels and the sub-roof framing to the structure, and prepared sealed plans, elevations and details for about 16,000 square feet of standing seam copper roofing and 33,000 square feet of copper wall panels. During construction REI observed the substrate, cleat fastening, seams and flashings, and directed corrections where the work departed from the design.


Scope of Work

  • Calculated design wind pressures and fastener pull-out resistance to set the spacing of metal Z's, wood sleepers, sheathing screws and panel cleats

  • Designed the sub-roof assembly over the metal deck: vapor barrier, galvanized Z's on isolation pads, two layers of rigid insulation, fire-retardant wood sleepers, sheathing and underlayment

  • Prepared sealed drawings (Sheets R-1 to R-5) with roof plan, panel layout elevations of the curved and angled walls, and eave, rake, ridge, parapet, curtain wall, door, roof hatch and transverse seam details

  • Revised the copper wall design to suit architect's proposal requests and the contractor's and architect's review comments

  • Observed construction of the roof substrate and the copper roof and wall panels, and identified items for correction such as unsoldered joints, door head drips, galvanic separation at roof hatches and penetrations through the siding


Results

  • Copper cladding installed over about 16,000 square feet of roof and 33,000 square feet of facade

  • The project received the 2011 Excellence in Copper Architecture Award (North America, New Construction)


Project Details

Client: The James Myers Company (design-build copper roofing and siding contractor), for George Mason University

Location: Manassas, Virginia (George Mason University, Prince William Campus)

Market: Higher Education

Project Category: Facade

REI Role: Subconsultant to The James Myers Company

Design: 2008 - 2009 (sealed drawings, Revision 2, October 2009)

Construction Observation: June - November 2009

Award: 2011 Excellence in Copper Architecture Award

Area / Quantity: Approximately 16,000 SF of copper roofing and 33,000 SF of copper wall panels

Roof System: 16 oz copper 1-inch double-lock standing seam panels at 21 inches on center on stainless steel expansion cleats, over rosin paper, underlayment, sheathing on wood sleepers and galvanized Z's, two layers of extruded polystyrene insulation and a vapor barrier on metal deck

Wall System: 16 oz copper 1-inch single-lock standing seam wall panels (20 oz at starter panels) on stainless steel expansion cleats over rosin paper and felt on fire-retardant plywood

Project Team: Architect: Hughes Group Architects; General Contractor: Whiting-Turner; Copper Roofing and Siding: The James Myers Company

Recognition: 2011 Excellence in Copper Architecture Award (North America, New Construction)

Services: Construction Administration

bottom of page