Fort Meade Building K Roof Wind Uplift Analysis
Wind uplift analysis and insulation and cover board attachment requirements for new membrane roofs at the stair towers and main entrance of a building at Fort Meade, Maryland.

Overview
REI was retained by the roofing contractor to analyze wind uplift for the new fully adhered PVC membrane roofs at the three stair towers and the main entrance of Building K at Fort Meade, Maryland. REI calculated components and cladding pressures under ASCE 7-10 and found maximum uplift pressures of 75 psf at the stair towers and 63 psf at the main entrance. REI prepared a roof zone drawing showing the field, perimeter and corner zones on each roof. Using the manufacturer's attachment tables, REI then set the number and layout of fasteners per cover board in each zone, along with the fastener type and minimum penetration through the steel deck. REI delivered stamped calculations and the roof zone drawing so the roofing met code and the manufacturer's requirements.
Scope of Work
Reviewed the architectural roof plans and the specified roofing assembly
Calculated components and cladding wind uplift pressures under ASCE 7-10 for the stair tower and main entrance roofs
Prepared a roof zone drawing identifying field, perimeter and corner zones
Set the number and layout of cover board fasteners per board in each zone, and fastener type and deck penetration
Issued stamped calculations and a summary letter
Project Details
Client: U.S. Army, Fort George G. Meade
Location: Fort Meade, Maryland
Market: Government
Project Category: Roofing
REI Role: Wind Uplift and Ballast Design Engineer
Analysis: 2019
Building: Multi-story building with stair tower and entrance roofs
System(s): Fully adhered PVC membrane over mechanically fastened cover board on steel deck
Services: Wind Uplift Analysis • Roof Attachment Design