Fairlington Glen Condominium Capital Reserve Study
Type I capital reserve study for a 56-building condominium community in Arlington, with an updated common-element plat and a 20-year projection of reserve expenditures and funding.

Overview
REI prepared the 2023 Capital Reserve Study for the Fairlington Glen Condominium Association, a community of 56 buildings with 3 to 11 town home or condominium units each, near North Quaker Lane and King Street in Arlington. The study catalogs the Association's common elements, from slate roofs, chimneys and stoops to pavement, utilities and the pool, and projects reserve expenditures over 20 years, through 2043. REI also prepared the Association's 2013 and 2018 studies.
Scope of Work
Reviewed the 2018 study and records of repair and replacement work, including slate roof, stoop and pavement projects REI designed since 2018
Observed and documented common elements across the community during field work in 2023 and 2024
Updated replacement costs and remaining useful lives in the asset schedule, including staggering replacement of the original Vermont slate roofs
Updated the common-element plat, separating Association and owner elements and adding water, sanitary and electrical lines
Prepared a 20-year multi-year expenditure table and, new for this study, a cash flow analysis of reserve funding
Results
Built the study as an updatable spreadsheet model, so the Board can refresh costs and inflation between the five-year studies required by the Virginia Condominium Act
Added a projection of reserve balances and funding ratio through 2043, prepared in continuity with the Association's previous in-house model
Based remaining service lives on actual conditions and REI's earlier studies and repair projects at the Glen, rather than generic tables alone
Project Details
Client: Fairlington Glen Condominium Association
Location: Arlington, Virginia
Market: Multifamily / Condominium
Project Category: Capital Reserve Study
REI Role: Prime Consultant
Field Work: Summer 2023 – Spring 2024
Study Completed: January 2025
Area / Quantity: 56 buildings; 20-year projection (2023–2043)
Study Type: Type I Capital Reserve Study
Services: Capital Reserve Study • Common-Element Plat Update • Reserve Funding Projection