Rooftop Terrace and Fountain Waterproofing Dispute
Expert review of leaks at a rooftop courtyard terrace and water-wall fountain on a renovated historic townhouse office building in Washington, DC, evaluating whether the failures stemmed from installation or from the design documents.

Overview
A late-19th-century townhouse in Washington, DC was renovated into an office headquarters with a fourth-floor courtyard terrace finished with stone pavers and a water-wall fountain. Leaks developed at the terrace and below the fountain after the renovation, the terrace roofing was replaced by another contractor, and the owner pursued claims against the contractors who had performed the original roofing and waterproofing. Counsel for the contractor team retained REI to evaluate the claims. REI inspected the terrace, reviewed the architect's drawings and specifications, the contractor's submittals, punch lists, the owner's consultant's investigation, replacement design and report, and interviewed the parties involved in the installation. REI's report found that the contract documents gave essentially no direction for the terrace roofing and waterproofing, its flashings at the window wall, or the fountain, whose final design was not settled until well into construction - leaving key waterproofing decisions to field personnel. REI also identified where the opposing consultant's conclusions were not supported by testing or did not account for these design omissions.
Scope of Work
Inspected the rooftop terrace, window wall and fountain on two occasions
Reviewed the original renovation drawings and specifications, the roofing submittals, punch lists and the replacement project manual, bid and contract
Reviewed the owner's consultant's water infiltration survey and report of findings on the terrace and fountain
Interviewed the general contractor and roofing installer regarding the sequence of work and the evolving fountain design
Prepared an expert report addressing the design documents, the installation, and each of the opposing consultant's conclusions
Results
Showed that the specifications contained no requirements for the terrace roofing membrane, flashing materials or warranty, and that the single fountain detail did not match the as-built conditions
Documented that the fountain waterproofing was designed and installed by multiple trades without transition details from the design team
Identified conclusions in the opposing report that were made without leak testing after the stone facing was removed
Project Details
Client: Confidential (retained by counsel for the contractor team)
Location: Washington, DC
Market: Commercial
Project Category: Expert Witness
REI Role: Consulting expert for the defense
Investigation / Report: 2009 - 2010
Building: Four-story late-19th-century townhouse renovated as an office headquarters, with a fourth-floor courtyard terrace and water-wall fountain
Issues: Leaks at the terrace roofing and paver system, window wall flashings and fountain basins
Key Finding: Contract documents did not define the terrace and fountain waterproofing, leaving design decisions to the field
Services: Forensic Investigation • Expert Consulting • Document Review • Standard of Care Analysis • Expert Report