Daughters of the American Revolution Headquarters Roof Replacement
Leak investigation, roof replacement design and construction administration for the historic Washington, D.C. headquarters of the Daughters of the American Revolution, including original copper batten seam roofs and a main skylight.

Overview
REI was retained by the Daughters of the American Revolution to investigate roof leaks and design roof replacements at its headquarters at 1776 D Street NW in Washington, D.C. Phase I covers Continental Hall and the Administration Building, including the main skylight and cupola and the original copper batten seam roofs. Phase II covers Constitution Hall. REI served as prime consultant and project manager, working directly for DAR. DAR occupies the buildings throughout construction.
Scope of Work
Investigated roof leaks with water testing and an infrared survey, and specified interim repairs at Constitution Hall while the replacement was designed
Prepared construction documents and specifications for Phase I (roof sections A–J) at Continental Hall and the Administration Building, and Phase II at Constitution Hall
Specified 20 oz copper batten seam roofing to match the original, 4-ply built-up roofing, and hot-applied rubberized asphalt protected membrane roofing with minimum R-33 insulation
Designed reglazing of the main skylight with triple-pane glazing on its existing framing, and reconstruction of the copper-clad cupola and louvers
Prepared responses to D.C. building permit and U.S. Commission of Fine Arts review comments, and assisted with the owner–contractor agreement
Providing construction administration: submittal reviews, observation reports and monthly payment reviews
Results
Addressed U.S. Commission of Fine Arts (Shipstead-Luce Act) review by matching the original copper roofing, battens, louvers and built-in gutters, with insulation upgrades unnoticeable from the ground
Kept the main skylight's existing aluminum framing in service, using custom screw bosses and copper-clad pressure plates to receive new triple-pane glazing
Planned the work around a fully occupied headquarters, with restricted access routes, noise limits and no noisy work on major holidays
Project Details
Client: Daughters of the American Revolution (DAR)
Location: Washington, D.C.
Market: Historic
Project Category: Roofing
REI Role: Prime Consultant / Project Manager
Design: Phase I: December 2025; Phase II: February 2026
Construction: Ongoing — substantial completion scheduled for August 2027
Area / Quantity: 56,750 SF of roofing (Constitution Hall: 36,000 SF; Continental Hall: 20,750 SF)
System(s): 20 oz copper batten seam roofing; 4-ply asphalt and fiberglass built-up roofing with modified bitumen cap sheet; hot-applied rubberized asphalt protected membrane roofing; triple-pane skylight glazing
Phases: Phase I: Continental Hall and Administration Building; Phase II: Constitution Hall
Services: Roof Condition Assessment • Infrared Roof Survey • Water Testing • Roof Replacement Design • Skylight Restoration Design • Permitting Assistance • Construction Administration