Captain's Quarters Seaside Condominium Capital Reserve Study
Type I capital reserve study for a 12-unit oceanfront condominium in Ocean City, the Association's first, prepared as it completed a major facade restoration, with a 20-year projection of reserve expenditures and funding.

Overview
REI prepared the 2023 Capital Reserve Study for the Captain's Quarters Seaside Condominium Association, a four-story, 12-unit oceanfront building on 137th Street in Ocean City, built in 1984 with enclosed ground-level parking. It was the Association's first reserve study, now required every five years under Maryland House Bill 107, and was timed to follow a 2021-2023 facade restoration that renewed the concrete balconies, coatings, EIFS, siding, railings, windows and doors. The study catalogs the common elements, from the building envelope and roofs to the asphalt parking lot, elevator, fire system and building utilities, and projects reserve expenditures over 20 years, through 2043. REI had investigated the building envelope and parking lot in 2018 and provided contract administration for the facade restoration.
Scope of Work
Reviewed original construction drawings and the records, warranties and contractor proposals from recent capital projects, including the facade restoration REI administered
Observed and photographed common elements during field work in June 2023 and estimated the remaining service life of each
Built an itemized component inventory with quantities, useful lives and current replacement costs, coordinated with the Board on owner versus Association items
Prepared a 20-year annual repair and replacement schedule with costs escalated using the Federal Reserve Bank of Cleveland's 30-year inflation forecast
Prepared a cash flow analysis of reserve contributions, expenditures and balances, and a site plan of the property
Results
Gave the Board a reserve plan to set its 2024 budget contribution, with funding options studied and a recommended contribution that increases each year
Showed that the existing contribution level would not keep a positive reserve balance, and flagged near-term work: parking lot resurfacing and regrading, elevator door equipment, and replacement of the flat, south metal and shingle roofs
Set inspection and recoating cycles for the newly restored concrete, coatings, EIFS and sealants, timed to manufacturer warranty extensions, so the facade investment is maintained
Project Details
Client: Captain's Quarters Seaside Condominium Association
Location: Ocean City, Maryland
Market: Multifamily / Condominium
Project Category: Capital Reserve Study
REI Role: Prime Consultant
Field Work: June 2023
Study Completed: September 2023
Area / Quantity: 1 four-story building, 12 units; 20-year projection (2023–2043)
Study Type: Type I Capital Reserve Study (Association's first)
Services: Capital Reserve Study • Reserve Funding Projection