Beach Elementary School New Roof Design for LEED Silver Construction
Roofing design and construction administration for about 47,500 square feet of fully adhered TPO roofing on the new Beach Elementary School, a LEED Silver project, with sumped drains, isometric transition details and an alternate PVC system.

Overview
As the roofing consultant to SEI Architects, REI designed the roofing for the new Beach Elementary School in Chesapeake Beach for Calvert County Public Schools, a LEED Silver project. The design covers about 47,500 square feet of 60-mil TPO membrane fully adhered to a high-density cover board over two layers of polyisocyanurate insulation (R-30 total) on sloped steel roof decks; the first insulation layer is mechanically attached and the second layer, crickets and cover board are set in urethane adhesive, with attachment patterns based on a wind analysis to ASCE 7-16. REI helped the Architect lay out the drainage, with cast iron primary drains set in tapered sumps and overflow drains set above the roof surface, and detailed the base flashings, parapets and copings, through-wall flashings, expansion joints, gutters and penetrations, including isometric details of transitions so they are permanently watertight without relying on sealant. REI also specified an alternate fully adhered PVC system and assisted with bidding. During construction REI reviewed the roofing and sheet metal submittals and shop drawings and observed the roofing and masonry through-wall flashing installations through a final punch-list inspection in November 2023.
Scope of Work
Designed 60-mil fully adhered TPO roofing over a high-density cover board and two layers of polyisocyanurate insulation (R-30) on sloped steel roof decks, with a 20-year no-dollar-limit manufacturer's warranty
Prepared specifications for an alternate fully adhered PVC roofing system and for sheet metal flashing and trim
Performed wind uplift and gutter and downspout calculations and detailed mechanical and adhesive attachment patterns for the insulation boards by roof zone
Assisted the Architect with the drainage layout: cast iron primary drains in tapered 8-foot sumps, overflow drains set above the roof surface, and tapered insulation crickets
Detailed base flashings, parapets and copings, gravel stops, through-wall flashings, expansion joints, gutters and penetrations, with isometric transition details that stay watertight without relying on sealant
Reviewed roofing, sheet metal and related submittals and shop drawings, answered RFIs, and observed the roofing and masonry through-wall flashing installations through the punch-list inspection
Results
Roofing installed by Interstate Corporation under general contractor Oak Contracting, with a Johns Manville TPO system and PAC-CLAD prefinished aluminum sheet metal
REI's punch-list inspection in November 2023 identified the remaining flashing, end dam and drainage items for correction before close-out
Project Details
Client: Calvert County Public Schools
Location: Chesapeake Beach, Maryland
Market: K-12 Education
Project Category: Roofing
REI Role: Subconsultant to SEI Architects
Design: October 2020 - May 2021 (bid set May 2021; conforming set October 2021)
Roofing Construction: 2022 - 2023 (punch-list inspection November 2023)
Area / Quantity: Approximately 47,500 SF of new roofing
System(s): 60-mil fully adhered TPO over high-density cover board and two layers of polyiso insulation (alternate: fully adhered PVC); cast iron drains in tapered sumps; prefinished aluminum copings and soldered stainless steel flashings
Certification: LEED Silver construction
Contractors: Oak Contracting, LLC (general contractor); Interstate Corporation (roofing)
Services: Roof Replacement Design • Bidding Assistance • Submittal Review • Construction Administration