›
Alexandria City Public Schools Roof Assessment, Inspection and Management Services
Semi-annual roof assessments, maintenance coordination and a roof condition database for 21 Alexandria City Public Schools buildings, with about 1.5 million square feet of roofs in more than 500 roof sections.

Overview
Alexandria City Public Schools selected REI to provide roof assessment, inspection and maintenance services for 21 school buildings. REI set up electronic inspection forms for use on a phone or tablet at every building, established a composite condition rating system, inventoried the existing roof warranties, and built a Microsoft Excel database identifying every building and roof section with its condition rating, rooftop components, warranty status and remaining service life. Each fall and spring, REI inspects every roof, rates its condition, and identifies maintenance and repair needs. During each cycle, REI's roofing subcontractor cleans the roofs and the primary and overflow drains, gutters and downspouts, and REI responds to ACPS work orders, typically for leaks and minor repairs. REI also performs infrared moisture surveys of selected low-slope roofs at ACPS's direction and recommends and prioritizes larger repair and replacement projects. REI has added new and renovated buildings to the program as they came online.
Scope of Work
Set up electronic field inspection forms, a composite roof condition rating system, a roof warranty inventory and a building and roof section database
Performs fall and spring visual assessments of every roof, rating each roof and identifying maintenance and repair items with priorities and photographs
Coordinates roof, drain, gutter and downspout cleaning by REI's roofing subcontractor each cycle, and responds to ACPS work orders for leaks and minor repairs
Performs infrared moisture surveys of selected low-slope roofs, confirmed with a capacitance moisture meter, at ACPS's direction
Prepares reports with estimated remaining service lives and prioritized repair and replacement recommendations
Delivers completed electronic inspection forms and an updated database to ACPS after each cycle
Results
A single, current record of the condition, components, warranties and remaining service life of more than 500 roof sections across the district
Routine maintenance and minor repairs handled every cycle, with each item documented in the inspection forms
New and renovated buildings added to the program as they come online
Project Details
Client: Alexandria City Public Schools
Location: Alexandria, Virginia
Market: K-12 Education
Project Category: Roofing
REI Role: Prime Consultant
Area / Quantity: 21 buildings; about 1.5 million SF of roofs in more than 500 roof sections; assessed twice a year
Buildings: Alexandria City High School and its Minnie Howard Campus; Francis C. Hammond and George Washington Middle Schools; Jefferson-Houston PreK-8 School; Charles Barrett, Cora Kelly, Douglas MacArthur, Ferdinand T. Day, George Mason, James K. Polk, John Adams, Lyles-Crouch, Mount Vernon, Naomi L. Brooks, Patrick Henry, Samuel W. Tucker and William Ramsay schools; Dee Campbell Rowing Center, Transportation Facility and 1703 N. Beauregard swing space
Deliverables: Electronic inspection forms for each roof, each cycle; Roof condition, component and warranty database (Microsoft Excel); Infrared moisture survey reports with plans of wet areas; Prioritized repair and replacement recommendations
Maintenance Subcontractor: CHU Contracting, Inc.
Services: Roof Condition Assessment • Infrared Roof Survey • Roof Maintenance and Repair








